STRASBOURG tram system Johan Neerman

STRASBOURG tram system – 1st line (1986-95)

COMPAGNIE DES TRANSPORTS STRASBOURGEOIS IN ASSOCIATION WITH GETAS (F)
STRASBOURG tram system – 1st line (1986-95)

Stage preceding consulting:
  • Study for the general design for the passenger rolling stock
  • Participation in the drawing-up of the specifications and the invitation to tender
  • Conformity inspection of the prototype’s construction
  • Study for the development of the 1st series stock
  • Pre-selection of the constructors
  • Technical balance-sheet
  • Conformity inspection of manufacture
  • Analysis of the tenders
  • Participation in acceptance for each vehicle